1. Bidding conditions
The construction of the customer service center and canteen of the XCMG Automobile Axle Manufacturing Project for this tender project has been approved by the Administrative Approval Bureau of Xuzhou High-tech Zone. Approval number: [2019]-150. The owner of the project is Xuzhou Xugong Automobile Manufacturing Co., Ltd. The construction funds come from state-owned funds, which have been implemented, and the project investment ratio is 100%. The project has the bidding conditions. The general contract for the customer service center and canteen project of the XCMG automobile axle manufacturing project is now open for bidding, and interested potential bidders are specially invited to participate in the bidding.
2. Project overview and bidding scope
2.1 Project Overview:
2.1.1 Construction location: South of Zhongka North Road, Xuzhou High-tech Zone, west of Pengzu Avenue, north of Xugong Fire Truck Lot
2.1.2 Construction scale: The total area of the building is about 8,048 square meters, and the total construction area is about 10,628 square meters. Among them, the warehouse construction area is about 4638 square meters, and the supporting living auxiliary building area is 5990 square meters.
2.1.3 Estimated contract price: about 3,500,000 yuan
2.1.4 Construction period requirements: Total construction period requirements: 240 calendar days. (Including: design duration: 30 calendar days, construction duration: 210 calendar days, drawing review time is included in the construction period).
2.1.5 Quality requirements:
(1) Design quality standards: meet the requirements of national and local design technical specifications, standards and regulations, and ensure that they pass the approval of relevant departments;
(2) Construction quality standard: qualified.
(3) Material procurement: meet and comply with the general contract of the project, and comply with the requirements of relevant acceptance specifications.
2.1.6 Bid section division: This bidding project is divided into one bid section
2.2 Scope of bidding: all engineering projects within the planning red line, including design (including plan design, preliminary design, construction drawing design, drawing review, design cooperation services in the construction phase, etc.), preliminary construction submission, material procurement, and the whole process of construction , Defect repair and warranty work during the project warranty period, until the completion of the project, acceptance and filing, and overall transfer (including file transfer).
3. Bidder qualification requirements
3.1 Applicants should have comprehensive Grade A engineering design or construction industry design level B (inclusive) or higher qualifications or construction industry (construction engineering) design level B (inclusive) or higher qualification design qualifications, and have the construction engineering general contracting level 3 (inclusive) ) And above construction qualification, and have the corresponding general contracting capabilities in terms of personnel, equipment, funds, etc.
3.2 The bidder's proposed general contracting project manager shall have a registered engineer for survey and design or a national registered supervision engineer for housing construction engineering or a national second-level registered architect (inclusive) or a national second-level registered structural engineer (inclusive) or higher or a construction engineering major Grade 2 Registered Constructor (included) or above (obtained the "Construction and Construction Enterprise Safety Production Assessment Certificate", within the validity period), who has not implemented the registered practice qualification, obtains the senior professional technical title, and must meet the following conditions:
(1) General contracting project managers shall not be employed or practiced in two or more units at the same time.
(2) General contracting project managers shall not hold positions on two or more projects at the same time.
(3) The general contracting project manager has no criminal record of bribery; or has a criminal record of bribery, but it has been more than 5 years since the date of record.
3.3 Performance of bidders and project leaders:
(1) The bidding applicant has undertaken similar projects since May 1, 2017 [Similar projects refer to the performance of public construction projects or general contracting of housing construction projects (EPC projects) with a single contract value greater than 25 million yuan, or the construction area of a single contract Design project performance of more than 7500 square meters] (Construction performance needs to provide the bid-winning notice, contract, and completion acceptance certificate, the time is subject to the completion acceptance time; the design performance needs to provide the contract, and the time is subject to the contract signing time).
(2) The project leader to be selected by the bidder has undertaken similar projects since May 1, 2017 [Similar projects refer to the performance of public construction projects or general contracting of housing construction projects (EPC projects) with a single contract value greater than 25 million yuan , Or the performance of a design project with a single contract construction area greater than 7500 square meters] (Construction performance needs to provide a bid winning notice, contract, and completion acceptance certificate, the time is subject to the completion acceptance time; the design performance needs to provide a contract, and the time is based on the contract signing time quasi).
3.4 The bidder shall not have the circumstances specified in item 1.4.3 of Chapter II of the Bidding Document.
3.5 The bidder and the proposed general contracting project manager shall have other requirements:
(1) If the bidder intends to assign the general contracting project manager as a registered constructor, he must obtain the "Construction Enterprise Safety Production Assessment Certificate" (Certificate B), and whether the general contracting project manager has no construction in progress after the change, or change There is no construction in progress afterwards (the original contract period must have expired and the change filing date has expired for 6 months), or the construction project has been suspended due to reasons other than the contractor or cannot be started on schedule for some reason, and the person in charge of the project has gone through the unlocking procedures , There may be construction in progress, but the construction in progress and the project in this bidding belong to the same project, the same project approval, the same construction site, and the total project scale is within the scope of the project manager’s practice Inside. The general contracting project manager shall not serve as the project leader, technical leader, quality inspector, safety officer, or constructor in other projects;
(2) If the bidder is a general contractor of construction projects, it must obtain the "Safety Production License" and the "Xuzhou Construction Industry Enterprise Credit Management Manual";
(3) If the bidder is a design company, it must obtain a valid corporate credit report issued by a third-party credit service agency filed by the Xuzhou City Social Credit System Construction Leading Group Office (a. Filed by the Xuzhou Social Credit System Construction Leading Group Office) For the name and contact information of the third-party credit service organization, please refer to the "Credit Xuzhou" [Website http://www.xuzhoucredit.gov.cn/index.htm] "Credit Reporting] "Credit Investigation Service Company" column; b. Third Party The time limit for a credit service agency to issue a credit report is 5 working days, the validity period of the credit report is 1 year, and it can be reused within the validity period; c. The supervision and management department of the third-party credit service agency is the Xuzhou City Social Credit System Construction Leading Group Office, Supervision telephone: 0516-83709981, 0516-80800966).
3.6 This bidding accepts consortium bids (the number of consortium companies does not exceed 2).
(1) The qualification (qualification) conditions of the consortium must meet the requirements of the bidding documents, and the consortium agreement shall be attached;
(2) The leader of the bidding for the consortium must be a qualified construction unit for general contracting of construction projects;
(3) If consortium bidding is adopted, it shall meet the requirements of Item 1.4.2 of Chapter II of the Bidding Document.
3.7 Punishment of the person who is untrustworthy is executed Su Xinxin Office [2018] No. 23.
3.8 The qualifications used by the bidding applicants shall not have unqualified verification results [inquiry of unqualified qualifications in dynamic supervision of the Jiangsu Construction Market Supervision and Integrity Information Integration Platform].
4. Obtaining bidding documents
4.1 The time for obtaining the bidding documents is: May 26, 2020 to June 30, 2020 9:30;
4.2 How to obtain bidding documents: bidders use CA digital certificates to log in to the "electronic bidding and bidding trading platform" to obtain;
The "electronic bidding and bidding trading platform" in this bidding announcement and bidding documents is selected: Xuzhou electronic bidding and bidding system (http://218.3.177.168/xzhynew/).
4.3 The price of each set of tender documents is 250 yuan, non-refundable after sale.
5. Deadline for bidding
5.1 The deadline for bidding is 9:30 on June 30, 2020.
5.2 The tenderee will not accept the tender documents delivered overdue.
6. Qualification review
This tender adopts the post-qualification method for qualification review. For details of the qualification review criteria, please refer to Chapter 3 of the tender documents.
7. Bid evaluation method
This project adopts a comprehensive evaluation method.
The bid evaluation standards and methods of this bidding are detailed in Chapter 3 of the bidding documents.
Recommended News

Suda Electronics: The role of capacitors

The working principle of the connector of Suda Electronics
2020-07-28

Suda Electronics: The advantages of solid state relays
2020-07-26

Mianyang Auto Parts Company: Why is the conversion of automobile oil to gas so popular?
2020-07-23

Mianyang Auto Parts Company: What should I pay attention to when using a cigarette lighter?
2020-07-03

Mianyang Auto Parts Company: A comprehensive introduction to auto parts
2020-06-28

Mianyang Auto Parts Company tells you the detailed parts of each system
2020-06-23

Mianyang Auto Parts Company: Some things about accessories!
2020-06-18

How to buy Sichuan auto parts?
2020-06-12

Industry economic environment analysis
2019-09-12
Recommended Business

Heze Geli Plastic Co., Ltd.
2020-09-24

Shenzhen Kangjie Lubricant Co., Ltd.
2020-09-24

Epson China Co., Ltd. Guangzhou Branch
2020-09-24

Fuyang City Xindeng Town Ultrafiltration Hardware Business Department
2020-09-24

Xin Hongtai Electronic Technology Co., Ltd.
2020-09-24

Inner Mongolia Nengbao Electronics Co., Ltd.
2020-09-24
Exhibition Information
About Us | Stay Cooperation | Delivery Policy | After-sales Service | Contact Us
COPYRIGHT © 2020 Auto Parts Online All Rights Reserved 丨 Icp No.19031523
Complaint Email Address Of This Website:846273991@qq.com Complaint Telephone Number:13990130299 China Internet Reporting Center Telephone Number:12377
Headquarters: No. 2 Road, Industrial Park, Mianyang Economic Experimental Zone, China, Sichuan, China Post Code:621000 Tel:0816-6282800 Fax:0816-6282800 Powered by www.300.cn